Boston Trinity Academy New Construction
Location
Boston, MA
General Contractor
Bowdoin Construction Corp
Engineer
BVH Integrated Services
Architect
Jones Architecture
![](https://themecteam.com/wp-content/uploads/2023/11/Service.png)
Project Overview
Brand new 8,800 square foot Bradley Athletic Center, features a large basketball court, bleachers, courtside seating, locker rooms, a prep kitchen, and office space.
MEC Electrical Contractors installed a new 600A utility service, fully integrated fire alarm system, and state-of-the art lighting/gym controls. MEC Technologies installed a new AV system for future events.
![](https://themecteam.com/wp-content/uploads/2023/03/Boston-Trinity_Court-Pano-scaled.jpg)