Snapdragon Chemistry Lab Construction
Location
Waltham, MA
General Contractor
A&M Construction Management
Engineer
NV5
Architect
IF Design LLC
Project Overview
Phase 2 of production and development labs for Snapdragon Chemistry, Inc. Included a new main electric room, three PR & D labs, and hazardous storage rooms. MEC handled all electrical for lab equipment, general power, lighting, gas detection, and fire alarm.